2018-2020

20 EV charging points in the first stage, with a targeted 40 (possible extension to 50)

02-encart

OBJECTIVES

Technical and contractual testing of a smart connection offer for LV EV charging points.

 

Implementation of a management solution in

Belle-Île in close cooperation with the “aVEnir” demonstrator.

calque-25
calque-27
calque-26
calque-24
calque-23
calque-22
calque-21
calque-29
calque-28
calque-20
calque-5

ACHIEVEMENTS AND LESSONS LEARNED

06-encart-bleu
06-picto-bleu

Further development

needed before roll out

LV smart connection offer for EV charging points: grouped connection to lower impact on grid infrastructure, define technical methods to coordinate aggregated consumptions, contractual engineering.

 

CPO Grid Signal: set up the technical means for creation and transmission of a distribution grid signal for power modulation at CPO level.

ONGOING