0

fond
07-encart-jaune

• MV/LV substation with dynamic tension management for LV.

 

 

• Older generation of local smart substations (PA IRIS).

 

 

• PLC use for upstream communication with Linky concentrators.

No grid-wide roll out

07-picto-jaune
06-encart-bleu

• Use of storage facilities to ease up renewables integration.

 

 

• Test of an aggregation IT portal (Alstom-GE).

 

 

• Islandings for provisional power supply in specific areas to strengthen resilience.

Further development needed before roll out

06-picto-bleu
05-encart-vert

• Development of a first generation of MV/LV “smart” substations with extended measurement functions.

 

• Load shedding on 300 customers (housing, businesses and storage): some difficulties in using flexibilities to address LV constraints (value for distribution grid is subject to local and provisional factors). 

Grid-wide roll out ongoing

05-picto-vert

ACHIEVEMENTS AND LESSONS LEARNED

logo-enedis
logo-rte
logo-socomec
logo-armines
logo-netsee
logo-alstom
logo-daikin
logo-xat
logo-edf
logo-saft
02-encart

• Optimise grid operation when PV generation is scaled up.

 

 

• Associate consumers to energy demand management.

 

 

• Research and experiment the technical and business case for electricity storage in batteries.

 

 

• Testing “temporary” islanding.

 

 

• Testing solutions for consumption and DER generation forecasts.

OBJECTIVES

01-encart copy (2)
01-encart

300 customers, 220 household customers for demand response, 80 household customers for PV and storage

2012-2016

Carros near Nice

Mobilising a smart solar urban area and electricity storage to address peak loads

lheaderogo
lheaderogo-2
header-bt-close

Find out more

05-bt-plus copy
05-bt-plus copy (1)

Find out more

pop1-fond
pop1-cadre
schema

• In the summer, deferral of consumption from 12:00 to 4pm (25%/customer on average, ie 5% of excess consumption in the area)

 

In the winter, decrease of peak time consumption from 6pm to 8pm (21%/customer on average ie 2% of substation power).

 

Contribution of Linky infrastructure in the implementation of smart solutions was confirmed

 

• In order to lift constraints on the LV grid, flexibility portfolios must include a statistically relevant customer basis and offer the right amount of power at the right time and right place.

real-time LV grid supervision service

ABILITY TO SCALE UP THE GEOGRAPHICAL AND CUSTOMER BASIS OF FLEXIBILITY OPERATIONS TO DELIVER MAXIMUM RESULTS

pop1-bt-close

A closer look on some major feedback

pop2-fond
pop2-cadre

• The battery + converter couple, together with local PV generation, enabled an islanding for five hours.

 

• Islanding requiring complex technical solutions (storage, break-up mechanisms, advanced metering tools, management algorithms…) at relatively high cost.

 

• Solution could prove relevant for remote locations or sites with unsteady power supply.

pop02-schema

TECHNICAL ABILITY TO IMPLEMENT ISLANDING IN A LIMITED TIME FRAME WITH PV GENERATION AND STOREGA

pop2-bt-close

A closer look on some major feedback

COMPLETED

DETAILS

Where :

When :

What :