Securing islands’ power supply through break-up power modulation

logo
bt-close
06-encart-bleu

Test of a first version of targeted curtailment, as an alternative to load shedding, based on reducing the break-up level on Linky meters.

Further development

needed before roll out

06-picto-bleu
05-encart-vert

Adaptation of the two islands’ MV grid through commissioning of remote controlled power switches.

 

Integration of diesel generators’ remote control to the grid command centre in Rennes.

Grid-wide roll out ongoing

05-picto-vert

ACHIEVEMENTS AND LESSONS LEARNED

02-encart
01-encart
01-encart copy (1)

Implementing a backup power supply solution for the islands in case of outage on undersea cables, factoring in intermittency of demand throughout seasons.

OBJECTIVES

520 Linky smart meters, 30 testers, 1 power generator, 6 secondary MV/LV substations

2011-2014

Houat and Höedic islands

COMPLETED

DETAILS

Where :

When :