Older generation of MV/LV smart substation (PA IRIS).

No grid-wide roll out

07-picto-jaune
06-encart-bleu

• Testing of a solution for centralised MV tension regulation (FAR U).

 

 

• VAR management at the crossroads of transmission and distribution grids (FAR Q): enabled to lift high tension constraints on the transmission network. Value assessment to be further detailed.

 

 

• Prototype for digital operation information exchange device (eDEIE)

 

 

• Technical and economic ranking of grid operations including flexibilities.

 

 

• Aggregators web portal.

Further development needed before roll out

06-picto-bleu
05-encart-vert

• IT planning infrastructure (jont maintenance planning with MV generators).

 

 

• “DispoRéseau” web portal for MV genertors (coordination; posting of updates on quality of supply).

 

 

• IT for consumption and generation forecasts (SYPEL).

 

 

• IT for grid data records (HDR).

 

 

• Constraints live simulator

(SIT-R STC).

 

 

• Operation information exchange device (DEIE).

 

 

• Development of 1st generation MV/LV smart substation.

 

 

• Smart grid connection offer for MV generators: three offers tested, awaiting regulatory changes.

 

 

• Economic assessment of flexibilities.

Grid-wide roll out ongoing

05-picto-vert

ACHIEVEMENTS AND LESSONS LEARNED

logo-cofely
logo-octility
logo-lecnam
logo-rete
logo-legrand
logo-alston
logo-sydev
logo-enedis
02-encart

• Implement technical and organisational solutions to streamline renewables’ grid connection and energy demand management actions while guaranteeing grid reliability and resilience.

 

 

 

 

• Define business models for local optimisation addressing all stakeholders’ needs.

 

 

 

 

• Assess local and “societal” integration of the project and its impact on the local electricity system and the whole industry.

OBJECTIVES

01-encart copy (1)
01-encart

100 business buildings and 10 000 public lighting units within the service area of 6 primary and 2 700 secondary substations, 3 MV wind generators.

2013-2018

Vendée département

Large scale energy optimisation for regions

header-logo
header-bt-close

Find out more

Find out more

05-bt-plus copy
05-bt-plus copy (1)
pop1-fond
pop1-cadre
objet-dynamique-vectoriel

• Ensuring upfront vision on grid operations to minimize impact of grid maintenance works on renewable generation, through enhanced cooperation with generators and the transmission network.

 

• Harmonised methodology for maintenance works planning

 

 

MAINTENANCE PLANNING 

pop1-bt-close

A closer look on some major feedback

pop02-fondblnc
pop2-cadre
objet-dynamique-vectoriel

Experimentation of “alternative” offers to streamline and reduce cost of grid connection in exchange for provisional curtailments of generation according to new contracts

Example of gains for a wind generation site

EXPERIMENTATION OF 3 "SMART CONNECTION OFFERS"