• Flexibility simulations proposed by an aggregator to address distribution grid’s needs, through a
cross-trade approach (grid operation and planning).
• Aggregators portal: Enedis’ eFlex solution (roll out pending).
• Upcoming islanding operations for provisional power supply to the Lerins islands through battery storage.